Signing all of the paperwork was a pretty easy process. We did have to sign and or initial about a million items! Let me telly you, when they say you do not get much at base price, take a look at all of the add-ons below.
We ended up with the following upgrades. All of these options were EXTRA on the base price of the home :
Elevation B - $2790
Hudson Designer Package (granite/hardwood/carpet etc) - $13,000
Finished basement and walkout sliding glass door - $17,090
Morning Room - $16,995
Cabinet crown molding and gourmet kitchen island - $3,790
Gas Range hook up - $275
Owner's Suite soaking tub and shower - $4,995
Oak Stairs - $2,995
Recessed lights, fan rough-ins, light pre-wires - $3,025
Desk - $9,216
That is a total of $75,471.00 in upgrades!!!!!!!!!!! WHAT, holy moly. It adds up fast!! One good thing is that most of those upgrades were included in that home site specials. We did get a discount/incentive pricing of $38,235. It didn't sting as hard, but it is still an additional $37,000.00. Trust me, that number went up in the process as well.
We are really happy with our decision and we got to place our own sold sign on our lot :)
This is our lot look from the street to the left side of our lot. 3 homes will be built on the cul-de-sac you can see in the background, but no one will ever be right in our backyard. We are also on the edge of those little woods.
James at the edge of our lot. We are pretty high up and have a nice view of the mountains in the distance and a winery.
This is our neighbors backyard
This is at the edge of the back of our lot looking towards the street. Nothing will be built in front of us, it is an island green space.
Sold!!!
Final picture of our community and our lot selection :)
No comments:
Post a Comment